It's taken longer than I wanted it to and I'm not sure why, so it must be my fault!
However the planning app is in and the decision date is mid-July if it goes well. Meanwhile we will probably do the groundworks design so we are ready to go. We won't order the frame until we have permission. I would hope to be in by next April but these are strange times.
|