>Someone missed a trick in the planning stage :-(
The problems in that area have been known about for donkey's years and the engineers at Austin Dept. of Transportation could have told them they were onto a loser thinking they could get away with just compressing the soil.
The existing roads around the site have dips and bumps that are constantly changing and can be three or four feet in amplitude.
|