Following on from Rattles dads incident, there is an area of new development in my area where the roads were in use before any building started or lighting was installed. Before the traffic calming was marked, and after the bollard was demolished many cars hit the obstruction in the road. In their wisdom the council installed unlit steel posts on the traffic calming with the obvious results. After these were flattened a traffic cone was in residence until the illuminated bollard was installed. Altogether this took about two years and numerous damaged cars. (Not my car, but I know the area).
g.co/maps/5hf89
Last edited by: Old Navy on Wed 14 Dec 11 at 08:53
|