Motoring Discussion > Box Hill ( Zig Zag) Surrey closed for resurfacing Miscellaneous
Thread Author: henry k Replies: 4

 Box Hill ( Zig Zag) Surrey closed for resurfacing - henry k
Details:-
www.bbc.co.uk/news/uk-england-surrey-17773990

This means no access from the A24 in the west while work is being done on the Zig Zag thus limiting access to the Headley side.
 Box Hill ( Zig Zag) Surrey closed for resurfacing - Old Navy
And the M9 and M90 are being realigned and resurfaced as part of the construction of the Forth replacement crossing. A little more disruption than a semi rural lane. Oh, I forgot it is a big deal because it is near Zero's patch. :-)
 Box Hill ( Zig Zag) Surrey closed for resurfacing - Duncan
>> And the M9 and M90 are being realigned and resurfaced as part of the construction
>> of the Forth replacement crossing.

How much is that costing us Southerners?
 Box Hill ( Zig Zag) Surrey closed for resurfacing - Old Navy
Megabucks. :-)
 Box Hill ( Zig Zag) Surrey closed for resurfacing - Oldgit
Re: Boxhill roadworks.
Will they be eliminating those nasty speed humps or re-instating them after resurfacing?
Anyway, it's hardly a rat run is it although I don't live locally so would not really know.
Last edited by: Oldgit on Mon 23 Apr 12 at 09:14
Latest Forum Posts